 Schedule and future Developments


Dubai metro project started in August 2005 with red line in Jebel Ali runs about 52 km long underground in the centre of the city and, the red line covers 10 stations in the first section and it was open at 9:09:09 PM on 9 September 2009, in April 2010 they complete the rest 19 stations, second line belted from July 2006 to March and opened in 9 September 2011. In future there will be two lines purple and line blue, blue and purple lines original proposed completion date by 2012.

Future developments:

Extension of lines:
RTA plans to extend the red line From Jebel Ali free zone to Dubai-Abu Dhabi border by 12 Km. RTA also considering the extension of the red line from Jebel Ali to the under construction Jebel Ali airport, but it’s still on planning. Green line also approved and extended by about 4.9 Km.

Car parking for rail users:
‘Car parking facility will be approved to metro users on the concept of "park and ride". There will be two major parking lots on red line- one at Rashidiya station for 3000 cars and at Jumairah Islands Station for another 3000 cars. The biggest parking lot will be built at Al Qusais Station with a capacity of 6000 cars. It will cater to users coming from Sharjah. There will be small parking spaces at each station while each station will be linked to other mode of transportation, including taxis, buses and at some stations water transportation’ (Mohamed Ali.P, 31-12-2010).

Adjust bus and taxi station:
The RTA is planning to have an integrated transport system so metro stations will have taxis, bus stations and water transport links at station near the creek and all of them will connect with smart card that allows passengers to travel on metro, buses and water transport and its easier find the parking areas.

Power distribution


The power distribution is placed under the construction and it will have two third rail collections system powered lines that will run underground in the city centre and on elevated viaducts elsewhere on double tracks.
The power is distributed from the ground to the viaduct which delivers the power to the train. The power is less concerned in the project of metro Dubai because the power will cost too much money that will affect the project progress for the other lines like purple and blue.
But there was a very good idea for reducing the use of power in metro Dubai which was building the stations that enters sun into the station. In addition, the brakes system of the train is a big power distributor for air conditioning inside the station and it is distributed whenever the train is going to stop. This is a solution for the reduction of money payments of electricity and will help save more money to continue the progress of the metro Dubai project.

Metro Dubai Structure


This part of the report will explain the structure design, material, and schedule of the metro Dubai project. The schedule part will inform you the period of time that the project needed to complete metro Dubai and how long it will last in the future.