 Schedule and future Developments


Dubai metro project started in August 2005 with red line in Jebel Ali runs about 52 km long underground in the centre of the city and, the red line covers 10 stations in the first section and it was open at 9:09:09 PM on 9 September 2009, in April 2010 they complete the rest 19 stations, second line belted from July 2006 to March and opened in 9 September 2011. In future there will be two lines purple and line blue, blue and purple lines original proposed completion date by 2012.

Future developments:

Extension of lines:
RTA plans to extend the red line From Jebel Ali free zone to Dubai-Abu Dhabi border by 12 Km. RTA also considering the extension of the red line from Jebel Ali to the under construction Jebel Ali airport, but it’s still on planning. Green line also approved and extended by about 4.9 Km.

Car parking for rail users:
‘Car parking facility will be approved to metro users on the concept of "park and ride". There will be two major parking lots on red line- one at Rashidiya station for 3000 cars and at Jumairah Islands Station for another 3000 cars. The biggest parking lot will be built at Al Qusais Station with a capacity of 6000 cars. It will cater to users coming from Sharjah. There will be small parking spaces at each station while each station will be linked to other mode of transportation, including taxis, buses and at some stations water transportation’ (Mohamed Ali.P, 31-12-2010).

Adjust bus and taxi station:
The RTA is planning to have an integrated transport system so metro stations will have taxis, bus stations and water transport links at station near the creek and all of them will connect with smart card that allows passengers to travel on metro, buses and water transport and its easier find the parking areas.

Power distribution


The power distribution is placed under the construction and it will have two third rail collections system powered lines that will run underground in the city centre and on elevated viaducts elsewhere on double tracks.
The power is distributed from the ground to the viaduct which delivers the power to the train. The power is less concerned in the project of metro Dubai because the power will cost too much money that will affect the project progress for the other lines like purple and blue.
But there was a very good idea for reducing the use of power in metro Dubai which was building the stations that enters sun into the station. In addition, the brakes system of the train is a big power distributor for air conditioning inside the station and it is distributed whenever the train is going to stop. This is a solution for the reduction of money payments of electricity and will help save more money to continue the progress of the metro Dubai project.

Metro Dubai Structure


This part of the report will explain the structure design, material, and schedule of the metro Dubai project. The schedule part will inform you the period of time that the project needed to complete metro Dubai and how long it will last in the future.

الأحد، 6 يناير 2013

Self- reflection

Self- reflection
In this course we have leaned many things such as writing CV, interview training, meeting training and final project.



In the following,
Topic sentence let as turn to same problems, I had this semester. First, I was shocked because of my low score because I expected to have a much better result in my CV, so I asked myself what is my problem? Why I have these score? So I decided to change myself, the way I learn and spend more time to study in my home, but I realized it was not the good solution, so I decided to find the problem and suggest some solutions.

Let’s talk about course subjects. in the first three weeks I have learned how to write CV like a professional, The CV task was gave priority to students to arrange Biography their own, and for submission in a manner ideal for employments official in the future, it is important for us as students to recognize the correct form of writing official letters to and was writing letters second task in this course. Third task we have learned is that Meeting and it is group work each group consists of four members maximum, the benefit of this task is to give the students the chance to communicate, discuss, and express their ideas, final task in this course was to write a report with 2000-2400 words about new ideas in Civil engineering followed by a presentation.

All in all, the course concept is to deal with practical tasks so it was improve my skills also Mr. Gregory helps me to make every thing looks better and clean, I like this course because it is different from our remaining courses and it raise my English level. 




293 Words